McGuffey Hall Rehabilitation – Miami University

  • McGuffey-Hall-Ext3
  • McGuffey-Hall-Auditorium1-Kids
  • McGuffey-Hall-Auditorium2
  • McGuffey-Hall-Classroom1
  • McGuffey-Hall-Classroom4a
  • McGuffey-Hall-Lounge1
  • McGuffey-Hall-Science-Lab1
  • McGuffey-Hall-Science-Lab4

Project Description

Specifications

The complete renovation of the largest academic building on campus integrates Miami’s “classroom of the future” prototype design and provides flexibility for future opportunities.

Key project features include:

  • Assessment of the 1909 building including the structural integrity of the building envelope and original wood floors, as well as the development of cost estimates.
  • The redesign of the building interior improves spatial organization and interior aesthetics.
  • An existing gymnasium space was transformed into a  flexible, multi-use seminar room offering fixed seating for large groups and informal seating for small group discussions.
  • A complete technology upgrade includes distributed networking in all classrooms and offices and electronic projection screens/presentation systems in all learning rooms.
  • All new mechanical, electrical and plumbing systems, including air conditioning, new lighting, fire protection and better alarm system.
Year Completed
2006
Location
Oxford, Ohio
Certifications
Categories

Visit Website